From survey to handover, the same six stages every time
From a bathroom to an entire building, what changes is the duration, not the sequence.
Survey and design review
We survey the existing building, take the measurements and define the works together with you and the appointed consultant.
Quotation
A quotation broken down item by item, so that what is included — and what is not — is visible. Amounts can change if the works change during construction, and every variation is agreed before it is carried out.
Works programme
Stages and dates fixed before the site opens, including the periods in which the property cannot be used.
Construction
A site manager as single point of contact and our own crews on site, for the building works as well as the electrical and plumbing installations. The site is cleaned and made safe every evening.
Progress and checks
Photographic updates at every stage, and interim payment certificates matching the works actually completed.
Testing and handover
Final inspection with the client, a schedule of finishes, and handover of the documentation and warranties. Defects are resolved before handover, not after.